PRO ENVIRO GROUP Sam Howard, Indoor Environmental Professional

Independent Indoor Environmental Professional | Huntsville and North Alabama

Life happens. Don't let it cost more than it should.

Hazards are identified before the walls are opened. The home is documented. The protocol is written for the job as it will be performed in the field. Engagements are accepted from property owners, insurance carriers and legal counsel.

Request an Evaluation The Cost of Not Checking
IICRC Certified: AMRT, WRT, ASD ANSI/IICRC S500 and S520 Analysis by an accredited third-party laboratory

Focus

Areas of Focus

Keeping Homeowners Safe

The people living in the home come first on every job. Site visits during the work verify that the containment is in place and the work is being done as written.

Expert Documentation of Homes

The condition of the home is recorded in writing with photographs, laboratory results and standard citations. The record is prepared for review by any party to the project.

Identifying Hazardous Situations

Asbestos-containing materials, mold growth, contaminated water and concealed moisture are identified before demolition begins.

Protocols for Real World Jobs

Protocols are written by a professional who has performed the work. They account for the access, the layout and the conditions the crew will have on site.

Before the First Cut

The Cost of Not Checking

After a water loss, a crew is in the home within hours and the walls are cut out the same day. Joint compound, ceiling texture, flooring and duct insulation can contain asbestos. In most homes, no one tested first.

1. The wall is cut

Fibers too small to see are released into the air of the home.

2. The fibers settle

They land on floors, furniture, clothing and inside the ductwork.

3. The system turns on

Every time the heating and cooling system runs, it moves those fibers through each room it serves.

4. The fibers are inhaled

Fibers that lodge in lung tissue can remain there for life. Disease can develop decades after the exposure.

The Cost of Not Checking

A sample taken before demolition is a small cost. After a release, the structure, the contents and the duct system all have to be addressed.

The Cost of Not Being Informed

A homeowner who knows what is in the walls can require the right controls before work begins. A homeowner who was never told has no opportunity to stop the work.

The Cost to Everyone Who Enters

The exposure reaches the family, their guests, the crew that made the cuts, every contractor who follows and the next owner of the home.

Have the home checked before the work starts.

Call 256-541-2858

Independence

Independence Statement

The same inspection method, the same published standards and the same report format apply to every engagement. The findings do not change based on which party retains the IEP.

One Client per Engagement

Each engagement has one retaining party. The retaining party is named in the report.

Fees for Time and Sampling

Fees are billed for time and sampling. No fee depends on the findings or on the result of a claim or dispute.

No Remediation or Repair Work

On a project where Sam Howard is retained as the IEP, he does not bid on or perform the remediation, restoration or repair work.

Conflict Review

Each request is reviewed for conflicts before it is accepted. A request is declined where a financial interest exists in the work being evaluated.

Third-Party Laboratory Analysis

Samples are collected under chain of custody and analyzed by an accredited laboratory. The laboratory report is included with the findings.

Standards-Based Findings

Reports state the conditions observed and the requirements of the applicable published standard. Decisions on the project remain with the client.

Services

Consulting Services

01

Water Damage Assessment

Site inspection of the affected areas, the water source and the extent of moisture. Water category is determined under ANSI/IICRC S500.

02

Mold Assessment

Inspection for suspected microbial growth and the moisture conditions that support it. Mold condition is determined under ANSI/IICRC S520.

03

Air and Surface Sampling

Air and surface samples are collected where the assessment requires them. Analysis is performed by an accredited laboratory.

04

Remediation Protocols

Written protocols specific to the property and the loss. Each requirement is stated with its standard citation.

05

Site Verification Visits

Scheduled visits during remediation and a final visual verification when the work is complete. Written findings follow each visit.

06

File and Standards Review

Review of mitigation and remediation records, photographs and reports against ANSI/IICRC S500 and S520.

Asbestos Services

Asbestos Sampling for Homeowners

Samples of suspect building materials are collected at the request of a homeowner to identify what is present in the home. Analysis is performed by an accredited laboratory. The results are reported to the homeowner for the homeowner's information.

Accredited Asbestos Inspections

Where an accredited asbestos inspection is required, including inspections for employers and contractors, the inspection is performed by a state accredited asbestos inspector. This office coordinates the scheduling, the evaluation and the reporting. The inspection report is issued by the accredited inspector.

Sam Howard is not a state accredited asbestos inspector. Homeowner sampling results are informational and are not an asbestos inspection for OSHA or other regulatory compliance.

Clients

Engagements Accepted

Insurance Carriers

Independent environmental assessment of a reported loss.

  • Water category and mold condition assessment
  • Review of mitigation and remediation records
  • Remediation protocol for a defined scope
  • Progress and final visual verification visits

Property Owners

Assessment and written requirements for a home or building.

  • Inspection for moisture and suspected microbial growth
  • Mold and asbestos sampling with accredited laboratory analysis
  • Protocol for the owner's remediation contractor
  • Site visits during remediation with written findings

Legal Counsel

Evaluations for plaintiff and defense counsel.

  • File and documentation review
  • Site evaluation where the property is available
  • Analysis of work performed against S500 and S520
  • Written evaluation report
  • Deposition and trial testimony

Process

Engagement Process

Step 1

Request and Conflict Review

The request, the property and the parties involved are reviewed before acceptance.

Step 2

Written Engagement

The scope of the evaluation and the fee schedule are set in writing with the retaining party.

Step 3

Site Visit and Sampling

The property is inspected and samples are collected where the assessment requires them.

Step 4

Written Report

The report states the findings, the requirements and the standard citations. It is issued to the retaining party.

Rates

Standard Rates

The same rates apply to every client.

Office Work

Protocols, reports, documentation and file review.

$125 per hour

Field Work

Site visits, inspections and sample collection.

$175 per hour

Legal Preparation

File review, analysis and report preparation for legal matters.

$225 per hour

Legal Field Work

Site evaluations performed for legal matters.

$275 per hour

Depositions

Per deposition, plus travel expenses.

$2,000

Trial Testimony

Per day of required attendance, plus travel expenses. A half day is $2,000.

$3,000 per day

Field Time

Field time begins on departure from the office and ends on return to the office.

Laboratory Analysis and Testing

Independent laboratory analysis and testing are billed separately from the hourly rates. Full sampling ranges from $250 to $1,100.

Qualifications

Sam Howard, Indoor Environmental Professional

  • IICRC Applied Microbial Remediation Technician (AMRT)
  • IICRC Water Damage Restoration Technician (WRT)
  • IICRC Applied Structural Drying Technician (ASD)
  • IICRC registration number 6271149
  • Field experience in water damage mitigation and mold remediation

Scope of Services

  • Final verification is a visual inspection with written findings.
  • Laboratory analysis is performed by an accredited third-party laboratory.
  • Structural assessment is referred to a qualified structural professional.
  • Asbestos inspections required for regulatory compliance are performed and reported by a state accredited asbestos inspector.
  • Insurance coverage, pricing and repair costs are outside the scope of an IEP report.

Contact

Request an Evaluation

Provide the property address, the type of loss and the parties involved. Requests are answered with availability and a written engagement.

Call 256-541-2858 sam@proenvirogroup.com

Huntsville, Madison County and North Alabama